Eight methods of controlling injection molding processing cost

Release time:2024-12-11

1、 Production workshop

The layout of the production workshop focuses on two aspects: meeting the production requirements, optimizing the layout according to the production process, and meeting the requirements of flexible energy use under specific production conditions.

1. While meeting the power requirements of stable production, the power supply has appropriate margin to avoid excessive reactive power consumption caused by excessive margin.

2. Establish efficient cooling water circulation facilities and equip the cooling water system with an effective insulation system.

3. Optimize the overall production layout of the workshop. Many production processes have sequential collaboration. Reasonable collaboration can reduce the time and energy consumption required for turnover and improve production efficiency.

4. Try to use effective small units to control lighting and other plant equipment separately.

5. Carry out regular maintenance of workshop equipment to avoid damaging public facilities, affecting the normal operation of production and further increasing energy consumption.


2、 Injection molding machine

It is the main energy consumption of the injection molding locomotive room, which is mainly composed of motor and heating.

1. Select the appropriate injection molding machine according to the product characteristics. "Big horse pulling small car" injection molding often means a lot of energy waste.

2. All electric injection molding machine and hybrid injection molding machine are selected, which can save energy by 20-80%.

3. New heating technologies such as electromagnetic induction heating and infrared heating can achieve 20-70% heating energy saving.

4. Heating and cooling system, take effective insulation measures to reduce heat and cold losses.

5. Keep the transmission parts of the equipment well lubricated and reduce the increase in energy consumption caused by increased friction or unstable operation of the equipment.

6. Select low compression hydraulic oil to reduce the waste of working energy of hydraulic system.

7. Using parallel action, multi cavity injection molding, multi-component injection molding and other processing technologies can significantly save energy.

8. The traditional mechanical hydraulic injection molding machine also has a variety of energy-saving drive systems, which can replace the traditional quantitative pump mechanical hydraulic injection molding machine with remarkable energy-saving effect.

9. Regularly maintain the heating and cooling pipes to ensure that there are no impurities, scale blockage and other phenomena inside the pipes, so as to achieve the designed heating and cooling efficiency.

10. Ensure that the injection molding machine is in good working condition. Unstable processing may lead to product defects and increase energy consumption.

11. Ensure that the equipment used is suitable for processing products, such as PVC processing, which usually requires the use of special screws.


3、 Injection mold

Mold structure and mold conditions often have a significant impact on injection molding cycle and processing energy consumption.

1. Reasonable mold design, including runner design, gate form, number of cavities, heating and cooling water channels, will help to reduce energy consumption.

2. Using hot runner mold can not only save materials and reduce the energy consumption of material recovery, but also have a significant energy-saving effect in the molding process itself.

3. Profiling rapid cooling and heating mold can significantly save processing energy consumption and obtain better surface quality.

4. Ensuring the balanced filling of each cavity is helpful to shorten the molding cycle, ensure the uniformity of product quality, and have excellent energy-saving effect.

5. Using CAE aided design technology and mold flow analysis and Simulation in mold design can reduce the energy consumption of mold debugging and multiple mold repair.

6. On the premise of ensuring the product quality, the use of low mold locking force for molding is helpful to prolong the service life of the mold, help the mold fill quickly, and help save energy.

7. Do a good job in mold maintenance to ensure effective heating and cooling water channel conditions.


4、 Surrounding equipment

1. Choose the auxiliary equipment suitable for the ability, which not only meets the job requirements, but also will not be too rich.

2. Do a good job of equipment maintenance to ensure that the equipment is in normal working condition. Abnormal auxiliary equipment will cause unstable production and even poor quality of parts, resulting in increased energy consumption.

3. Optimize the collaboration and operation sequence between the host and surrounding devices.

4. Optimize the mutual position of surrounding equipment and production equipment, and make the surrounding equipment as close to the host as possible without affecting the operating conditions.

5. Many auxiliary equipment manufacturers provide on-demand energy supply systems that can achieve significant energy savings.

6. The use of rapid die change equipment reduces the waiting time required to switch products in production.


5、 Materials

The energy consumption of different materials processing is different. At the same time, poor management of materials or improper management of recycled materials will increase the energy consumption of production.

1. On the premise of meeting product performance, materials with low processing energy consumption are preferred.

2. Under the condition of meeting the use performance and cost optimization, high liquidity materials are preferred.

3. Please note that materials from different suppliers may have different process conditions.

4. It is better to dry the materials together with drying to avoid wasting energy due to the moisture regain of the dried materials.

5. Take good care of the materials to prevent them from mixing with impurities or foreign matters, which will eventually lead to poor products.

6. Some recycled materials are allowed to be added to some products, but attention should be paid to the preservation and cleaning of recycled materials to avoid defects due to unclean materials.


6、 Processing technology

1. On the premise of meeting the product performance, use the shortest molding cycle.

2. If there are no special factors, try to use the processing technology recommended by the supplier for processing.

3. For specific products and molds, save all stable equipment and process parameters to shorten the adjustment time of the next production change.

4. Optimize the process, adopt lower clamping force, shorter cooling time and holding time.


7、 Adopt new technology

1. Adopt auxiliary molding technology, such as gas assisted, liquid assisted, steam assisted, micro foaming injection molding technology, etc.

2. Adopt unitized forming scheme to reduce intermediate links.

3. New technologies such as in mold welding, in mold spraying, in mold assembly and in mold decoration are adopted.

4. The new low-pressure forming technology can shorten the forming cycle and reduce the melt temperature at the same time.

5. Adopt energy regeneration system.


8、 Production management

1. To produce high-quality products at one time and reduce the defect rate is a great energy saving.

2. The maintenance of the whole production system is closely related to energy consumption. This involves not only the host, but also peripheral equipment and factory equipment. For example, if the mold changing crane in the workshop breaks down and requires manual mold changing, the waiting time of the equipment will inevitably be extended and the energy consumption of the equipment will be increased.

3. Equipped with workshop energy consumption monitoring system, it is convenient for enterprises to implement energy analysis and improvement purposefully.

4. When the equipment is shut down for maintenance, it is not only necessary to check the maintenance contents and items of the equipment itself, but also pay attention to the connection between the equipment and other systems, whether the working performance is reliable, etc.

5. Regularly compare with industry benchmarks to see if there is room for further improvement.

Copyright: Shenzhen Zhongyuan Plastic Co., Ltd. | mold processing customized manufacturer. If you want to know the processing price of the factory, how much is it, and which is good, please contact us Yue ICP Bei No. 17060480
蜜臀av日日欢夜夜爽一区-av在线免费永久播放| 美女把腿张开给帅哥桶-无码无套少妇18p在线直播| 国产人妻人伦精品日本-国产98超碰人人做人人爱| 十九禁止观看无码视频-亚洲国产激情福利专区| 国产av一区二区三区日韩接吻-av网址在线播放网站| 久久久精品欧美日韩国产-欧美精品乱码视频在线| 日韩中文字幕v亚洲中文字幕-日韩亚洲av免费在线观看| 人妻少妇无乱码中文字幕-人成免费视频一区二区| 中文字幕偷拍亚洲九色-亚洲视频不卡一区二区天堂| 亚洲美女喘息呻吟的网站-国产免费一区二区三区三洲| 亚洲av日韩五月天久热精品-国产日韩欧美一区二区三区群战| 婷婷人妻少妇激情在线-欧美日韩人体艺术一区二区| 青青操大香蕉在线播放-国产亚洲欧美精品在线观看| 久久网站中文字幕精品-三级精品久久中文字幕| 青青操大香蕉在线播放-国产亚洲欧美精品在线观看| 日韩精品中文在线观看一区-亚洲bt欧美bt精品| 久久免费观看归女高潮特黄-黄色av一本二本在线观看| 欧美字幕一区二区三区-好吊妞欧美一区二区在线观看| 国产精品美女在线网址-久草免费福利在线观看视频| 四虎成人在线免费视频-亚洲熟女中文字幕天堂| 免费看黄色污污的网站-欧美一区二区三区爽爽| 久久网址一区二区精品视频-日产国产欧美视频一区精品| 国产欧美成人精品第一区-日本黄色精品一区二区| 可以免费看污污视频的网站-日韩欧美不卡视频在线观看| 国产日韩电影一区二区三区-美女露双奶头无遮挡物| 午夜福利卫生纸福利院-一区二区三区久久亚洲| 久久久精品欧美日韩国产-欧美精品乱码视频在线| 国产精品一区二区在线免费-久久精品国产亚洲av热明星| 亚洲国产中文欧美一区二区三区-国产精品一区二区视频成人| 国产亚洲欧美一区91-亚洲欧美一区二区在线| 熟妇勾子乱一区二区三区-欧美爱爱视频一区二区| 久久久噜噜噜久久狠狠50岁-精品一区二区三区av| 国产成人精品亚洲精品密奴-国产成人AV无码精品| 熟女少妇免费一区二区-麻豆一区二区三区免费在线观看| 欧洲精品一区二区三区中文字幕-91久久国产综合久久蜜月精品| 国产精品电影在线一区-亚洲国产大片一区二区官网| 欧洲精品一区二区三区中文字幕-91久久国产综合久久蜜月精品| 欧美精品一区二区不卡-精品国产一区二区三区香蕉网址| 黄片黄片在线免费观看-激情综合网激情五月俺也去| 女主播啪啪大秀免费观看-精品99午夜福利影院| 深夜三级福利在线播放-日韩精品一区二区在线天天狠天|